09 Aug
09Aug

What are tenant changes?
Tenant changes are an opportunity to adapt the contractor's apartment to your needs during construction. Instead of accepting the standard design and specifications and changing everything after receiving the key, plan in advance the distribution, electricity, lighting, plumbing, kitchen, bathrooms and air conditioning — and submit organized plans to the contractor for execution.

Proper planning during the tenant change phase can save on demolitions, duplicate work, and unnecessary expenses after receiving the apartment.

The changes that should be made in a new apartment from a contractor:

  • Electricity and lighting – addition and correct placement of outlets, switches, power points, communications and lighting in accordance with the furniture design.
  • Air conditioning – correct and aesthetic placement of air conditioning louvers, vents, and ducts.
  • Bathrooms – upgrading the flooring and coverings, changing the locations of sanitary ware if possible, niches, faucets, and planning a drainage channel in the shower.
  • Kitchen – adjusting the electrical and plumbing points for the new kitchen, planning the electrical appliances, storage and lighting even before installing the kitchen.
  • Carpentry and storage – pre-planning of cabinets, carpentry walls, and storage solutions to prepare the necessary electrical and lighting points for them in advance.

Why is it important to make the changes before execution?

Many decisions that seem small on paper affect each other. The placement of the sofa affects the electrical, the kitchen affects the plumbing and lighting, and the air conditioning affects the ceiling and carpentry.